Energy control for mission-critical systems

Forecast and optimize airport HVAC using flight schedules, weather, and energy tariffs to reduce demand charges without new hardware or comfort trade-offs.

Airport energy demand is surging while control remains fragmented

Airports are electrifying fleets, adding EV charging, and expanding terminals. Power demand is rising 2-3x by 2030, yet most hubs still run siloed control systems that can't see how assets interact or predict what happens next.

HVAC optimization today, expanding to adjacent energy assets over time

Our HVAC optimization software integrates with existing BMS to forecast demand using flight schedules, weather, occupancy, and energy tariffs. Roadmap includes asset health monitoring and distributed energy resource coordination.

01

HVAC Optimization (Now)

Forecasts and optimizes HVAC loads using flight schedules, weather, occupancy, and tariffs to reduce energy costs and demand charges within comfort constraints, integrating with existing BMS.

02

Asset Health (Roadmap)

Fault detection and predictive maintenance for HVAC and central plant equipment. Early-stage development.

03

DER Optimization (Roadmap)

Coordinates on-site storage, generation, and flexible loads to manage peaks and reliability where present. Early-stage development.

How we approach HVAC optimization

Software-only integration with existing BMS and building systems. Forecasts demand, optimizes control decisions, and provides auditable recommendations with measured baselines.

01

HVAC-focused coordination

Forecasts HVAC demand across zones and air handling units, optimizing precooling, staging, and load shifts to reduce demand charges while maintaining comfort constraints.

02

Demand forecasting

Forecasts thermal loads using flight schedules, weather, occupancy, and tariff data to optimize HVAC operations ahead of peak periods and price spikes.

03

Auditable recommendations

Every control decision is logged with baseline comparisons, measured outcomes, and traceable inputs. Verifiable reporting for procurement and operations teams.

04

Software-only integration

Integrates with existing BMS via standard protocols. Deployment timeline depends on site complexity, data access, and integration requirements. No new hardware required.

15-25%
Targeted energy reduction
30-60
Days to deployment
Zero
Hardware required